FROM THE BLOG

Company News

Notes on initial start-up of organic fertilizer granulator

2023/07/25

Organic fertilizer granulator initial boot operation steps:

1. Before starting, heat up for about forty to fifty minutes. Raise the temperature to pull the motor triangle belt by hand until it is set in place; Pull eight to ten times in the normal working direction. Then continue to heat up for ten minutes, and then start, but continue to warm, because normal production needs to connect to add heat; Adjust different temperatures according to different properties of plastics.

2.When the organic fertilizer equipment is working normally, the machine temperature should be maintained and consolidated, not high and low. Near the vent hole, until the temperature of the head part should be maintained at 200 ° C (referring to C material and B material).

3. Feed evenly and add enough. Machine feed speed and feed speed should be properly coordinated. Otherwise, it will affect the quality and yield of the particles.

4.When shut down, the main secret completely cut off the power supply. The head wire plug (part with wrench) must be removed.

Rotary drum granulator use precautions:

1.The granulator should run forward to avoid reversal.

2.The granulator should avoid the empty running of the cooling machine, and the heat machine should be fed, which can avoid the phenomenon of sticking (holding shaft).

3.The feed port of the granulator, the vent hole is strictly prohibited from entering the iron and other debris. So as not to cause accidents and affect production.

4.Always pay attention to the temperature change of the fuselage, and when touching the sliver with clean hands, it should be heated immediately. Until the cops get their hands on it.

5.When the bearing part of the reducer is burned, or accompanied by noise, it should be repaired in time and supplemented with refueling.

6.When the bearing parts at both ends of the main engine bearing room are hot and burn hands or there is noise, it is necessary to stop the maintenance and add butter. When working normally, butter is added to the bearing chamber every 5-6 days.

7.Pay attention to find out the operation law of the machine; Such as: machine temperature, speed, according to the situation, timely treatment.

When the fuselage is running unstable, attention should be paid to check whether the gap between the shaft connector is too tight, and it should be loosened in time.